ABOUT US
ABOUT WEA
ABOUT WEA TH
THAILAND PROJECT EXPERIENCE
THAILAND REFERENCE CUSTOMER
PROJECT REFERENCE
OUR HISTORY
DESIGN EXPERTISE
FRONT END ENGINEERING DESIGN (FEED) & COMMERCIAL BIDDING SUPPORT
ENGINEERING ANALYSIS & SAVINGS
OPTIMISED SOURCING SOLUTIONS
FRAME AGREEMENT EXECUTION
INDUSTRIAL UPS SYSTEM
PROJECT & MAINTENANCE MATERIAL SUPPLIES
PRODUCTS
UNINTERRUPTIBLE POWER SUPPLY (UPS)
ONSHORE & OFFSHORE INDUSTRIAL UNINTERRUPTIBLE POWER SUPPLY (UPS) AC/DC SYSTEMS
INDUSTRIAL UPS
EXPLOSION PROOFING, ATEX/IECEX, UPS
SODIUM METAL CHLORIDE (SMC) UNINTERRUPTIBLE POWER SUPPLY (UPS)
ELECTRICAL/LIGHTING SOLUTIONS & CONTROL SYSTEMS
INDUSTRIAL LIGHTING SYSTEM
INDUSTRIAL & ON/OFFSHORE OBSTRUCTION LIGHTING & CONTROL SYSTEM
CENTRAL BATTERY SYSTEM (CBS)
RETROFIT LIGHTING POLE
RETURN ON INVESTMENT ANALYSIS & CALCULATIONS
CABLE LADDER/TRAY & SUPPORT SYSTEM
INDOOR/OUTDOOR POWER DISTRIBUTION, MCC & VFD’S
INDOOR/OUTDOOR JUNCTION BOXES, INTERFACE BOXES & EMC CABINETS
LOCAL CONTROL STATION (LCS) & SAFETY SWITCH
POWER SOCKETS & RECEPTACLES
MULTI-CABLE TRANSIT (MCT)
INDUSTRIAL, OFFSHORE, SUBMERSIBLE CABLES
CABLE GLANDS & CABLE ACCESSORIES
FLEXIBLE & ACCESSORIES
HEAT TRACING SYSTEM
TERMINATION KIT – COLD SHRINK
DRIVELINE COUPLINGS
SERVICES
CMMS PROCESS
WHAT IS THE BENEFIT?
HOW WE DO IT?
MATERIAL MANAGEMENT
CABLE MANAGEMENT
PROJECTS
AIRPORTS AND SEA PORTS
GLOBAL LNG PROJECTS AND MODULE YARDS COORDINATION
GLOBAL CONSTRUCTION PROJECTS
CHEMICAL, PHARMACEUTICAL & REFINERIES
MILITARY & DEFENCE CONTRACTORS
MINING AND MINERALS
OFFSHORE OIL, GAS & MARINE PROJECTS
RENEWABLES
TRANSPORTATION
DATA CENTER SOLUTION
NETWORK
GLOBAL NETWORK
ASIA NETWORK
GLOBAL MANUFACTURING & STRATEGIC PARTNERS
ABOUT US
ABOUT WEA
ABOUT WEA TH
THAILAND PROJECT EXPERIENCE
THAILAND REFERENCE CUSTOMER
PROJECT REFERENCE
OUR HISTORY
DESIGN EXPERTISE
FRONT END ENGINEERING DESIGN (FEED) & COMMERCIAL BIDDING SUPPORT
ENGINEERING ANALYSIS & SAVINGS
OPTIMISED SOURCING SOLUTIONS
FRAME AGREEMENT EXECUTION
INDUSTRIAL UPS SYSTEM
PROJECT & MAINTENANCE MATERIAL SUPPLIES
PRODUCTS
UNINTERRUPTIBLE POWER SUPPLY (UPS)
ONSHORE & OFFSHORE INDUSTRIAL UNINTERRUPTIBLE POWER SUPPLY (UPS) AC/DC SYSTEMS
INDUSTRIAL UPS
EXPLOSION PROOFING, ATEX/IECEX, UPS
SODIUM METAL CHLORIDE (SMC) UNINTERRUPTIBLE POWER SUPPLY (UPS)
ELECTRICAL/LIGHTING SOLUTIONS & CONTROL SYSTEMS
INDUSTRIAL LIGHTING SYSTEM
INDUSTRIAL & ON/OFFSHORE OBSTRUCTION LIGHTING & CONTROL SYSTEM
CENTRAL BATTERY SYSTEM (CBS)
RETROFIT LIGHTING POLE
RETURN ON INVESTMENT ANALYSIS & CALCULATIONS
CABLE LADDER/TRAY & SUPPORT SYSTEM
INDOOR/OUTDOOR POWER DISTRIBUTION, MCC & VFD’S
INDOOR/OUTDOOR JUNCTION BOXES, INTERFACE BOXES & EMC CABINETS
LOCAL CONTROL STATION (LCS) & SAFETY SWITCH
POWER SOCKETS & RECEPTACLES
MULTI-CABLE TRANSIT (MCT)
INDUSTRIAL, OFFSHORE, SUBMERSIBLE CABLES
CABLE GLANDS & CABLE ACCESSORIES
FLEXIBLE & ACCESSORIES
HEAT TRACING SYSTEM
TERMINATION KIT – COLD SHRINK
DRIVELINE COUPLINGS
SERVICES
CMMS PROCESS
WHAT IS THE BENEFIT?
HOW WE DO IT?
MATERIAL MANAGEMENT
CABLE MANAGEMENT
PROJECTS
AIRPORTS AND SEA PORTS
GLOBAL LNG PROJECTS AND MODULE YARDS COORDINATION
GLOBAL CONSTRUCTION PROJECTS
CHEMICAL, PHARMACEUTICAL & REFINERIES
MILITARY & DEFENCE CONTRACTORS
MINING AND MINERALS
OFFSHORE OIL, GAS & MARINE PROJECTS
RENEWABLES
TRANSPORTATION
DATA CENTER SOLUTION
NETWORK
GLOBAL NETWORK
ASIA NETWORK
GLOBAL MANUFACTURING & STRATEGIC PARTNERS
Cable Ladder/Tray & Support System
B-Line Cable Ladder/Tray & Supports in Offshore & Onshore
Aluminum Ladder & Tray
Stainless Steel Ladder & Tray
FRP Ladder & Tray
Perforated Cable Tray
FlexTray Wire Basket
Strut Systems & Accessories
Our Cable Ladder/Tray Global Engineering & Design Services
Cable Support System Design
3D Routing & 2D Layouts
Material Take-Off (MTO)
Bill of Material (BOM)
Mechanical & Structural Design
Support Location & Design
Construction Detailed Drawings
Detailed Product Drawings
Wind load calculation and verification
Dynamic load calculations
Finite element analysis
Natural frequency analysis
Seismic calculations and analysis
Testing and certification service
Case study for E&I Tray System 3D Layouts
2D Drawing Design Capability
E&I Ladder/Tray Optimization
I-beam Tray Performance Optimization
High strength ladder tray = 6mtr support spans =
56,000 supports not required
IEC 61537 certified = electrical continuity =
56,000 bonding cables not required
Wedge-lock splice = mid-span =
56,000 splice plates + 896,000 bolts not required
High strength to weight ratio = less material higher strength =
NEMA 20C+
SSS-17 Tray Support Optimization
Tray support recommendations = system optimization =
113,000 supports not required
HD expansion splice = no support expansion joint =
14,500 supports not required
DNV certifications = 3rd party verification =
proven and guaranteed performance
Less supports = less design hours, less material, less installation =
127,500 hours saved
Cover Installation Optimization
LCCSD cover clamps = one clamp fits all cover sizes =
one part standardization
High performance = secure fixing, simple quick installation =
reduce cover install cost
186,000+ hours saved + $10M+ material saved
Our Strategic Engineering Support
Contact Our Specialists
for More Information
Check here if you accept our terms (Privacy Policy)
FIND OUT MORE
Industrial, Offshore, Submersible Cables
FIND OUT MORE
Power Sockets & Receptacles
< prev
next >