Year | End user/ Client | Project Name | Supplied Items | Value |
2019 | All About Construction | Rajchabhat Lanna Chiangmai University – Conduit, Transformer, Cable, Lighting package | Charoenchai, Arrow, Phelps dodge, L&E | 2 M THB |
2019 | Bangchak/ Yokogawa Thailand/ RJSS | Bangchak 3E Phase 2 – Instrument Cable package | BCC | 1.8 M THB |
2019 | STP&I | Orange/ Pink Line Monorail Switching Beam Project | Arrow Conduit/ Unistrut/ Miner Bumper | 2 M THB |
2019 | PAE | Electrical Receptacle and Plug | EATON Crouse-hinds | 1.3 M THB |
2019 | STECON | LCS/ JB for Gulf Chana Project | ROSE Phoenix Mecano | 500K THB |
2019 | Solar Express | Solar Roof Project 950kW and 650kW at Saraburi | CHINT Astronergy | 14M THB |
2019 | Mubadala Petroleum | ‘CCTV Crane Camera sets on NY WHP-B | EATON Hernis | 1.2 M THB |
2019 | Michelin/ IACG | Michelin HTLY4 – Cable | BCC, Prysmian MCI Draka | 20 M THB |
2019 | Michelin/ IACG | Michelin HTLY4 – Cable tray, Conduit, Tubing & Fitting, Cable Gland, Accessories, Junction Box, Termination Kits | SMC, Panasonic, Pelco, Hylok, EATON Capri/ Raychem | 9.5 M THB |
2019 | Michelin/ IACG | Michelin HTYL4 Lot 4 Package Installation – Cable, Cable Tray, Cable Gland | BCC, Lapp cable, SMC, EATON Capri | 6.5M THB |
2019 | PTT/ Yokogawa Thailand | ASM Project – Junction Box, Cable Gland | EATON Crouse-hinds/ EATON Capri | 1M THB |
2019 | AAE Engineering | KPN Health Care – Exit Sign/ Emergency Lighting package/ Switch & Plug package | Max-bright, Bticino | 1.8 M THB |
2019-2020 | Vatana Phaisal Engineering (VPE) | Exxon Blade Heater Package – E&L Bulks Scope | EATON Crouse-hinds, Okonite, EATON B-Line, Hoffman, Dialight, Elpress, Southwire | 45 M THB |
2019-2020 | CUEL | Exxon Blade Module package – E&L Bulks Scope, lighting pole, lighting fixture, cable, cable tray, cable gland, conduit fitting, conduit, starter package, control station, Junction box, transformer, distribution board | EATON Crouse-hinds, Okonite, EATON B-Line, Hoffman, Dialight, V-spring, Allied Conduit | 180 M THB |
2019 | PTTGC7 | Lighting fixture revamp project | EATON Crouse-hinds | 925K THB |
2019 | Systronik | Bangchak Refinery CCTV modification | EATON CEAG | 800K THB |
2019 | Stepwise Engineering | Kasemraj Hospital Project at Pracheenburi | BCC Cable | 6.5 M THB |
2019 | Stepwise Engineering | Vana Nava Phuket | BCC Cable | 5 M THB |
2019 | Mitsubishi Hitachi Sumitomo Corporation (MHSC) | Red Line Project – Cable Gland Package | EATON Capri | 700K THB |
2020 | Shell/ QTEC Technology | Shell Tank Farm – Cable package | Phelps dodge | 4.2 M THB |
2020 | Stepwise Engineering | Centara Grand Bangkok – Cable package | Phelps dodge | 4.8 M THB |
2020 | Stepwise Engineering | Angsana Project – Cable Package | BCC Cable | 450 K THB |
2020 | QSEC | The Shade Sathorn | BCC Cable | 2.55 M THB |
| | | | |
| | | | |